Текущий сайт: Peikko Kazakhstan. Хотите сменить страну или язык?
Peikko Benelux provided HPKM column shoes for the 12 meter tall concrete columns of project Van Raam.
A fast, safe and support free erection of the concrete columns was possible because of this. This choice has resulted in a lot of time saving and a satisfied contractor.

Wim Zwaan
Managing Director
Peikko Benelux B.V.
Тел. +31 (0)26 384 38 66
Моб. +31 (0)6 23 80 70 05
[email protected]