Текущий сайт: Peikko Kazakhstan. Хотите сменить страну или язык?

Federal Chancellery of Germany, Berlin, Germany

  • Тип здания:
  • Other Public Buildings
Полный экран Закрыть Вид с улицы

Bolted connections for precast concrete parts in the largest government headquarters in the world

In order to build the Federal Chancellery in Berlin, Peikko's bolted connections were used for the precast concrete elements, some of which were made in white pigmented exposed concrete.Anchor bolts and column shoes for precast columns as well as wall shoes in connection with anchor bolts enabled efficient assembly of the reinforced concrete supporting structure.  

Together with the Marie-Elisabeth-Lüders House and Paul-Löbe Building, the Federal Chancellery is part of the "Federal Belt" (German: "Band des Bundes"), an architectural symbol of the German unity. The building complex was built when the goverment of Germany moved from Bonn to Berlin about ten years after the German reunification 1989.

Читать далее down-arrow.png

The construction with its unusual variety of shapes in exposed concrete required very high standards in structural design and building physics.

GSE Ingenieurgesellschaft mbH

Факты проекта

Размер проекта:
25347 m2
Этажи проекта:
8
Разработчик:
Im Auftrag der Bundesrepublik Deutschland für die Bundesregierung Bundesbaugesellschaft Berlin
Строительная компания:
Arge Rohbau Bundeskanzleramt, Hmb Hallesche Mitteldeutsche Bau AG, Wayss & Freytag AG, Hoch- und Wirtschaftsbau, Cubiertas Y Mzov GmbH
Строительный дизайнер:
GSE Ingenieurgesellschaft mbH
Архитектор:
SCHULTES FRANK ARCHITEKTEN
Год завершения:
2001

Решения, которые мы предоставили

Свяжитесь с нами

Tobias Althaus

Tobias Althaus

Managing Director, Peikko Deutschland GmbH

Моб. +49 170 163 8168
[email protected]