Текущий сайт: Peikko Kazakhstan. Хотите сменить страну или язык?

City Electrical Factors (CEF) IT and Marketing Office, Durham, UK

  • Тип здания:
  • Office Buildings
Полный экран Закрыть Вид с улицы

For the new CEF Date, IT and Marketing Centre the architects Faulkner Brown wanted a “technologically cutting-edge building”

A kit of parts approach was taken and 90nr DELTABEAM®s were incorporated into the design along with Peikko Column Shoes & Anchor bolts. DELTABEAM® Composite Beams providing a slim floor and flat soffit also interfaced with precast floor units which incorporated combined heating & cooling system, creating a Thermally Active Building System (TABS). The frame was delivered the 11-week contractual period.

The new CEF headquarters also secured the 2019 RIBA Northeast Building of the Year Award.

Читать далее down-arrow.png

Факты проекта

Размер проекта:
2100 m2
Этажи проекта:
2
Разработчик:
CEF Ltd
Строительная компания:
PCE Ltd
Строительный дизайнер:
Curtins
Архитектор:
FaulknerBrowns
Год поставки:
2016
Год завершения:
2017

Решения, которые мы предоставили

Свяжитесь с нами

Michael Scott

Michael Scott

Sales Manager, DELTABEAM® Products

Тел. +44 1325 318619
Моб. +44 755 7118470
[email protected]